[Instant Help From 10$/Pg] Categorical Prediction Using Principal

[Instant Help From 10$/Pg] Categorical Prediction Using Principal

 

Unit Outcomes:

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now
  • Integrate methods for assessing risks.
  • Prepare a rubric for classifying risk.
  • Report results of risk analysis.

Course Outcome:

IT528-3: Develop appropriate action plans that address risks.

Purpose

There are many methods for categorical prediction using principal components. In this Assignment, you will practice one of these — linear discriminant analysis, in R Studio. You will classify risk through the rubric of a risk matrix and then build a model to assess the risk. Once you have built a model, you will report and explain the results.

Assignment Instructions

Much has been made of the deteriorating public infrastructure in the United States. Roads, bridges, sidewalks, etc. need repair all over the country. This Assignment will focus on bridges. Engineers with responsibility for bridges categorize them into one of four categories with respect to risk: Monitor, Schedule Assessment, Schedule Repair/Replacement, or Immediate Repair/Replacement. Monitor means that the bridge is in good condition and is not in danger of failing. Schedule Assessment means that the bridge is showing signs of risk and should be evaluated. Schedule Repair/Replacement means that the bridge has deterioration that presents risk to users. Immediate Repair/Replacement means that the bridge has deterioration that presents risk of failure. In a Word document, create a four-quadrant risk matrix rubric and label the quadrants High Risk/High Impact; High Risk/Low Impact; Low Risk/High Impact; Low Risk/Low Impact. Place each of the four bridge conditions into the quadrant that you believe is appropriate for that condition. You need not have something in each of the four quadrants – your task is to appropriately assess and classify risk based on bridge condition. For each of the four bridge conditions, within the quadrant you selected in the risk matrix, give an example of an issue that may arise if the risk condition is not addressed.

 

Looking for a Similar Assignment? Let us take care of your classwork while you enjoy your free time! All papers are written from scratch and are 100% Original. Try us today! Use Code FREE15