[Instant Help From 10$/Pg] 30 Parts Per Hour

[Instant Help From 10$/Pg] 30 Parts Per Hour

 You have a two step process for manufacturing tools. The first step is  fabrication operation which requires a set-up. The setup time is 15  minutes and the nominal processing time is 0.5 minutes per part. The  second process is a batch furnace. The nominal heat treatment time is 2  hours and the furnace can process a maximum of 100 parts per run.  However the furnace also breaks down with a mean time to fail of 4 hrs  and mean time to repair of 0.5 hrs. The repair time has an exponential  distribution. Assuming that the transfer lot size is same the process  batch size, and the required production rate is 30 parts per hour with  arrival SCV of 1 to the first step, determine the following: 

  1. What is availability of each of the two processes?
  2.  What is the SCV of process times for each of the two processes?
  3. Assuming that we use the same batch size for both operations, what is the minimum batch size for stable system.
  4. What  is the total average cycle time to manufacture a part for a batch size =  2 times the minimum batch size determined in part(a).?
 

Looking for a Similar Assignment? Let us take care of your classwork while you enjoy your free time! All papers are written from scratch and are 100% Original. Try us today! Use Code FREE15

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now